Jump to content
Sign in to follow this  
Shropshire_killie

Lockdown Projects

Recommended Posts

2 hours ago, Shropshire_killie said:

Hey folks. So I've been locked down since March so heres my project in me garden Ive been building not finished yet. It's called McLeans Folly. 

20200610_141835.jpg

Looks good. 

Share this post


Link to post
Share on other sites
2 hours ago, Shropshire_killie said:

Hey folks. So I've been locked down since March so heres my project in me garden Ive been building not finished yet. It's called McLeans Folly. 

20200610_141835.jpg

Please tell me it’s an outside loo behind that door :) and not just a back door . 

Share this post


Link to post
Share on other sites

In my garden tomorrow,   where there was a 39ft beach tree, there will be a summer house which will house my hot tub.

Took me feckin ages to get the base frame level.

Shropshire  your project looks superb 

Share this post


Link to post
Share on other sites
10 hours ago, Beaker71 said:

In my garden tomorrow,   where there was a 39ft beach tree, there will be a summer house which will house my hot tub.

Took me feckin ages to get the base frame level.

Shropshire  your project looks superb 

Need a bar in there as well Beaker! 

Share this post


Link to post
Share on other sites
17 minutes ago, Shropshire_killie said:

That door leads to the untamed garden beyond ...

Can I suggest you get an old toilet and place it behind that door , if it’s still your garden beyond . 
 

Now that would be a talking point , your structure deserves it :) 

Share this post


Link to post
Share on other sites
3 hours ago, Bonbon19 said:

Can I suggest you get an old toilet and place it behind that door , if it’s still your garden beyond . 
 

Now that would be a talking point , your structure deserves it :) 

Not a bad idea Bonbon. I do have a pee up beyond there on occasion! 

Share this post


Link to post
Share on other sites

Project phase 1 construction complete, external painting complete.

Just a new lock, internal painting and electrics to go in then the hot tub is moving in.

 

20200611_204308.jpg

Share this post


Link to post
Share on other sites
On 6/11/2020 at 8:57 PM, Beaker71 said:

Project phase 1 construction complete, external painting complete.

Just a new lock, internal painting and electrics to go in then the hot tub is moving in.

 

20200611_204308.jpg

Tidy!

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

The Killie Trust

KFC Supporters Association

Young Kilmarnock

FC Kilmarnock

Kilmarnock FC (Official)

×